NASA Sets Coverage for Artemis I Moon Mission Launch
NASA is targeting Monday, Nov. 14, for the launch of the Artemis I Moon mission during a 69-minute launch window that opens at 12:07 a.m. EST. The launch countdown will begin Saturday, Nov. 12, at 12:27 a.m.
Artemis I is the first integrated flight test of NASA’s Space Launch System (SLS) rocket, an uncrewed Orion spacecraft, and the ground systems at the agency’s Kennedy Space Center in Florida that will pave the way for a crewed test flight and future human lunar exploration as part of Artemis.
The SLS rocket and Orion spacecraft arrived Friday, Nov. 4 at about 8:30 a.m.
Engineers previously rolled the rocket back to the Vehicle Assembly Building (VAB) Sept. 26 ahead of Hurricane Ian and after waving off two previous launch attempts Aug. 29 due to a faulty temperature sensor, and Sept. 4 due to a liquid hydrogen leak at an interface between the rocket and mobile launcher. Prior to rolling back to the VAB, teams successfully repaired the leak and demonstrated updated tanking procedures. While in the VAB, teams performed standard maintenance to repair minor damage to the foam and cork on the thermal protection system and recharge or replace batteries throughout the system.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.